An offshore platform for Venice

We produced a revision of the Environmental Monitoring Plan for the definitive design of an offshore platform for the Port of Venice. We then carried out all the measuring of the environmental parameters required by the plan: atmosphere, lagoon turbidity, lagoon and marine waters, sediments, marine habitats (phanerogams) and noise. This was followed up by an environmental pre-feasibility study of the possibility of building a new container terminal in the Malamocco area.

Tipologia: 
Environmental Monitoring Plan
Committente: 
Autorità di Sistema Portuale del Mare Adriatico Settentrionale – Porto di Venezia
Luogo: 
Venezia
Area: 
Veneto